LGA storage tank upgrade.
Delivered the upgrade of an existing gate standpipe from a direct-fed arrangement to a buffered supply from two 1 ML bulk water storage tanks and a dedicated standpipe pump.
The project
From direct feed to buffered supply.
Working for head contractor Airpro Mechanical, Fourtrex upgraded existing water supply infrastructure at Brockman 2, converting a gate standpipe from a direct-fed arrangement to a buffered supply to support bulk water distribution and operational requirements.
Works included the installation of DN250 to DN355 HDPE pipework between two 1 ML tanks, the standpipe pump and the standpipe itself, together with valves, flow meters and associated fittings. The pipework was connected to a diesel pump skid.
Our role
Fourtrex's scope.
- DN250 to DN355 HDPE pipework throughout
- Pipework between two 1 ML tanks and the standpipe pump
- Connection through to the standpipe
- Diaphragm valves
- Air valves, flow meters and associated fittings
- Connection to a diesel pump skid
Gallery
On site.
Services
Capability behind this project.
Water infrastructure
Pipeline supply and installation, HDPE fabrication and welding, water transfer systems, valves, fittings and equipment.
Explore service 02Mine water management
Dewatering, mine water transfer, storage and pump systems, standpipes and associated pipework.
Explore service →All projects
Selected projects demonstrating capability across diverse scopes.
View projectsStart the conversation
Discuss your next storage tank upgrade.
Contact Fourtrex to discuss the duty, the tanks and the outcome you need.