Plan
Review the scope, site conditions and operational demands of each project before work starts.
Trusted by Western Australia's mining and civil operators
How we work
We bring together the specialist services a project needs. By coordinating interconnected scopes of work, we reduce handovers, streamline project delivery and minimise disruption to operations.
Review the scope, site conditions and operational demands of each project before work starts.
Supply, fabricate and install, coordinating connected scopes in the field to reduce project complexity.
Test, flush and commission the work, then hand it over with the records the client needs.
Maintain and support the work after handover, with field crews where they are needed.
Core services
Pipeline supply and installation, HDPE fabrication and welding, water transfer systems, tailings and associated piping, valves, fittings and equipment.
Explore service 02Dewatering, mine water transfer, water management systems, pump systems, sales and hire, borefield installations, commissioning and site servicing.
Explore serviceIntegrated services
Civil infrastructure and plumbing and gas complete the package, so interconnected scopes sit with one contractor instead of three.
Excavation, trenching and backfill, and in-ground common services: water, sewer, stormwater, gas and electrical conduits, plus site preparation and road crossings.
Explore service 04Mining, commercial and residential plumbing and gas, from water supply, drainage and fire services through to camp maintenance and backflow prevention testing.
Explore serviceWhy Fourtrex
Project-focused and accountable, we combine technical depth with clear communication, responsive decision-making and defined responsibilities at every stage of project delivery.
From remote mine sites to metropolitan infrastructure, surface or below ground, we deliver solutions tailored to the technical requirements, site conditions and operational demands of each project.
Track record
Delivered HDPE pipework for the principal contractor on a new services corridor beside an operational processing facility, including 13 km of HDPE from 63 mm to 710 mm, valve stations, culvert sleeves and associated fittings.
View projectDelivered DN250 to DN355 HDPE pipework, diaphragm valves, air valves and flow meters to convert a gate standpipe from a direct-fed line to a buffer storage system with a dedicated pump.
View projectGet in touch
Contact Fourtrex to discuss your scope requirements and programme. Tell us about the site and the outcome you need, and we will help identify a practical path forward.