Selected projects demonstrating capability across diverse scopes.
Projects that reflect the quality of our work and delivery, across water infrastructure, mine water, civil and plumbing scopes for mining operators and contractors throughout Western Australia.
All projects
KCGM Stage 2 enabling works
Delivered HDPE pipework for the principal contractor on a new services corridor adjacent to an operational processing facility, including 13 km of HDPE from 63 mm to 710 mm, valve stations, culvert sleeves and fittings.
View projectLGA storage tank upgrade
Delivered DN250 to DN355 HDPE pipework, diaphragm valves, air valves and flow meters to convert a gate standpipe from a direct-fed line to a buffered supply with a dedicated pump.
View projectProcess water transfer upgrade
Completed the welding and installation of 3 km of DN630 HDPE process water pipeline through a constrained refinery corridor, including trenching, backfill and in-ditch closing welds at two fixed tie-ins to existing steel.
View projectMardie salt water transfer
Undertook the welding, laying and installation of the DN630 HDPE transfer line for the principal contractor, connecting the transfer pond to the crystallisers, with flange bolt-up throughout.
View projectWater and electrical services upgrade
Completed the welding and preparation of 3 km of DN180 water main and 6 km of DN110 and DN160 electrical conduit servicing the Geordie Bay accommodation units, with tie-ins, testing and commissioning.
View projectCommercial high-rise plumbing
Fourtrex plumbing crews delivering sanitary and stormwater stacks, hot and cold water and fire services on Perth high-rise and high-end apartment projects, from rough-in through to fit-off and testing.
View projectNo projects match that filter yet.
Start the conversation
Discuss your next project.
Contact Fourtrex to discuss the site, your scope requirements and programme, and we will help identify a practical, fit-for-purpose solution.