Mardie salt water transfer.

Undertook the welding, laying and installation of the DN630 HDPE transfer line for the principal contractor, connecting the transfer pond to the crystallisers at BCI Minerals' Mardie Salt project.

End clientBCI Minerals
LocationMardie, WA
DeliveredJune – August 2025
ServiceMine Water Management, Water Infrastructure

The project

From transfer pond to crystalliser.

Fourtrex delivered the DN630 HDPE transfer line at BCI Minerals' Mardie Salt project as a subcontractor to the principal contractor, with the scope focused on pipeline fabrication and installation as part of the site's water transfer infrastructure.

Works covered the welding, laying and installation of the line, including flange bolt-up throughout, and totalled around 20 km of pipe once the ancillary runs are counted.

Our role

Fourtrex's scope.

  • Around 20 km of pipe including ancillary runs
  • DN630 HDPE transfer line
  • HDPE fabrication and welding
  • Laying and installation
  • Flange bolt-up throughout
  • Transfer pond to crystalliser alignment