Water and electrical services upgrade.

Welded and prepared 3 km of DN180 water main and 6 km of electrical conduit as part of infrastructure upgrades at Geordie Bay, Rottnest Island.

ClientDM Civil
LocationRottnest Island, WA
DeliveredJune – August 2024
ServiceCivil Infrastructure, Water Infrastructure

The project

New services with minimal surface disruption.

Fourtrex supported DM Civil on infrastructure upgrades at Geordie Bay, completing the welding and preparation of new distribution water mains and electrical conduits servicing the accommodation units.

The services were installed using trenchless methods where required, accommodating existing infrastructure and minimising surface disruption across a sensitive, high-traffic island site.

Our role

Fourtrex's scope.

  • Welding and preparation of 3 km of DN180 water main
  • Welding and preparation of 6 km of DN110 and DN160 electrical conduit
  • Tie-ins to existing mains
  • Pits, valves and fittings
  • Pressure testing
  • Commissioning