Water and electrical services upgrade.
Welded and prepared 3 km of DN180 water main and 6 km of electrical conduit as part of infrastructure upgrades at Geordie Bay, Rottnest Island.
The project
New services with minimal surface disruption.
Fourtrex supported DM Civil on infrastructure upgrades at Geordie Bay, completing the welding and preparation of new distribution water mains and electrical conduits servicing the accommodation units.
The services were installed using trenchless methods where required, accommodating existing infrastructure and minimising surface disruption across a sensitive, high-traffic island site.
Our role
Fourtrex's scope.
- Welding and preparation of 3 km of DN180 water main
- Welding and preparation of 6 km of DN110 and DN160 electrical conduit
- Tie-ins to existing mains
- Pits, valves and fittings
- Pressure testing
- Commissioning
Gallery
On site.
Services
Capability behind this project.
Water infrastructure
Pipeline supply and installation, HDPE fabrication and welding, water transfer systems, valves, fittings and equipment.
Explore service 03Civil infrastructure
Excavation, trenching and backfill, and in-ground common services: water, sewer, stormwater, gas and electrical conduits, plus site preparation and road crossings.
Explore service →All projects
Selected projects demonstrating capability across diverse scopes.
View projectsStart the conversation
Discuss your next services upgrade.
Contact Fourtrex to discuss the corridor, the site constraints and the outcome you need.